Notes du studio.

Études de cas d'ingénierie, notes de terrain de projet, analyses de sourcing et leçons tirées de la livraison de projets industriels sur les marchés émergents.

Case Study Production line
March 20266 min

Inside an Algiers food packaging line: from RFP to first article in 11 months.

A complete project timeline including OEM selection, customs clearance, and the unexpected pre-treatment redesign that saved six weeks.

Read →
Sourcing Heavy equipment
March 20265 min

Direct OEM vs distributor sourcing: a real cost comparison on €1.2M of heavy equipment.

When buying direct saves money — and the three scenarios where going through a distributor is actually faster and cheaper.

Read →
Ingénierie Powder coating
February 20267 min

Powder coating in 38°C: humidity, dust, and pre-treatment design for hot climates.

Why off-the-shelf European booth designs fail in MENA conditions — and the four engineering changes we now make standard.

Read →
Industry Medical equipment
February 20264 min

The 18-month lead time on MRI installations is finally collapsing. Here's why.

Supply chain shifts after 2024, new manufacturer partnerships, and what this means for hospital procurement timelines.

Read →
Field Note Architecture
January 20268 min

Project management in Lagos: a working model that survived four customs delays.

How we restructure timelines, contracts, and communication when working in markets with unpredictable logistics.

Read →
Method Engineering
January 202610 min

Bill of materials engineering: how we cost a project before quoting it.

A look at our internal estimation methodology — including the spreadsheet templates we use for Tier-1 engagements.

Read →
— Subscribe

Quarterly notes,
no marketing.

Once a quarter we send a roundup of project case studies, sourcing intelligence, and lessons from the field. No promotional content. Unsubscribe anytime.

Get the Quarterly →